Canton Fair 140th: A Buyer's Pre-Trip Checklist (Oct 15–Nov 4, 2026)
Prepare for the 140th Canton Fair with phase dates, a buyer checklist, supplier verification steps, and a blank comparison record.
The 140th Canton Fair ended on November 4, 2026; this guide supports post-fair follow-up and preparation for the next session, whose dates should be checked on the official Canton Fair website.
Before you leave for the Canton Fair, have five things ready: the right phase for your products, confirmed registration and travel documents, accommodation and transport arrangements, a consistent supplier comparison sheet, and written verification and payment boundaries. Aim to return with comparable offers and evidence you can check.
The 140th Canton Fair ran October 15–November 4, 2026, at the China Import and Export Fair Complex in Pazhou, Guangzhou. Confirm the relevant phase before booking for a future session. (Canton Fair official website, checked October 8, 2026.)

Which Canton Fair phase covers your products?
All three phases of the 140th session have ended; use the following breakdown as a historical reference and confirm categories for the next session with the organizer.
Use this category map to narrow your travel dates:
| Phase | Dates | Product categories |
|---|---|---|
| Phase 1 | October 15–19, 2026 | Electronics, lighting, machinery, vehicles, hardware |
| Phase 2 | October 23–27, 2026 | Housewares, gifts, building materials, furniture |
| Phase 3 | October 31–November 4, 2026 | Textiles, clothing, health/medical |
Phase 1: Advanced Manufacturing
| Product group | Official exhibition sections |
|---|---|
| Electronics & Appliance | Household Electrical Appliances; Consumer Electronics and Information Products |
| Manufacturing | Industrial Automation and Intelligent Manufacturing; Processing Machinery Equipment; Power Machinery and Electric Power; General Machinery and Mechanical Basic Parts; Construction Machinery; Agricultural Machinery; New Materials and Chemical Products |
| Vehicles & Two Wheels | New Energy Vehicles and Smart Mobility; Vehicles; Vehicle Spare Parts; Motorcycles; Bicycles |
| Light & Electrical | Lighting Equipment; Electronic and Electrical Products; New Energy Resources |
| Hardware | Hardware; Tools |
| Additional zone | Service Robots |
Phase 2: Quality Home Life
| Product group | Official exhibition sections |
|---|---|
| Housewares | General Ceramics; Kitchenware and Tableware; Household Items |
| Gifts & Decorations | Glass Artware; Home Decorations; Gardening Products; Festival Products; Gifts and Premiums; Clocks, Watches and Optical Instruments; Art Ceramics; Weaving, Rattan and Iron Products |
| Building & Furniture | Building and Decorative Materials; Sanitary and Bathroom Equipment; Furniture; Prefabricated House and Courtyard Facilities |
| Additional zone | Fashion Jewelry |
Phase 3: Better Life
| Product group | Official exhibition sections |
|---|---|
| Toys & Children Baby and Maternity | Toys; Children, Baby and Maternity Products |
| Fashion | Kids’ Wear; Men and Women’s Clothing; Underwear; Sports and Casual Wear; Furs, Leather, Downs and Related Products; Fashion Accessories and Fittings; Textile Raw Materials and Fabrics; Shoes; Cases and Bags |
| Home Textiles | Home Textiles; Carpets and Tapestries |
| Stationery | Office Supplies |
| Health & Recreation | Medicines, Health Products and Medical Devices; Food; Sports, Travel and Recreation Products; Personal Care Products; Toiletries; Pet Products and Food |
| Additional sections and zones | Traditional Chinese Specialties; Intelligent Healthcare |
The official maps also show the International Pavilion in Phases 2 and 3.
Categories that are easy to place in the wrong phase
- Carpets and home textiles: Phase 3, rather than Phase 2’s furniture group.
- Office supplies: Phase 3; office furniture belongs with Furniture in Phase 2.
- Kitchenware and tableware: Phase 2, alongside General Ceramics.
- Building materials: Phase 2 under Building and Decorative Materials, rather than Phase 1.
- Lighting: Phase 1 under Lighting Equipment, rather than Phase 2’s home categories.
October 20–22 and October 28–30, 2026, were changeover intervals with no onsite exhibition.
Schedule source: Canton Fair official website and official changeover schedule; section sources: official Phase 1, Phase 2 and Phase 3 maps, checked October 22, 2026.
Write down your main product, intended use, and adjacent categories. A furniture buyer sourcing integrated lighting should check where each product is listed before choosing dates.
These categories do not establish an exhibitor’s location. Verify current exhibition sections and individual listings yourself.
Is the trip worthwhile for a small order?
Before booking, ask whether you have a defined product category and an order size that suppliers can quote on practical terms. Some small buyers report that minimum order quantities can make a fair visit difficult to justify; there is no universal quantity threshold. Compare the cost of travel with the value of the supplier meetings you expect to arrange.
If your order is small, consider checking Guangzhou markets or planning a Yiwu market visit before deciding whether the fair fits your buying plan. Yiwu can be visited outside fair dates and also hosts international trade events; check current opening and event details before booking. Neither route guarantees a suitable supplier or a lower total cost.
Budget for accommodation, meals and transport using prices available for your actual travel dates: visitors report higher costs during the fair. Some people who have visited alone say solo travel is feasible. Prepare as you would for any trip: keep copies of documents, choose accommodation with a practical route, and arrange reliable communications.
The 10-item pre-trip checklist
1. Registration
Use the official buyer service channel and save your confirmation offline. Check what remains necessary to collect or activate your badge. Submission alone should not be treated as confirmed admission; verify your application status.
2. Invitation letter
Check whether your travel arrangements require an invitation and request it through the appropriate official channel. Match your identity details carefully. An invitation does not establish entry permission; verify applicable travel requirements separately.
3. Hotel and transport
Confirm the hotel’s address, cancellation terms, and route to Pazhou. Save the address in Chinese and English. Treat journey estimates as assumptions: traffic, shuttle arrangements, and transport availability need checking closer to departure.
4. Interpreter
Share your specification and terminology beforehand. Agree on availability, fees, and confidentiality. Ask the interpreter to distinguish the supplier’s statement from their own interpretation, and obtain written confirmation of important technical answers.
5. Business cards
Prepare cards with your name, company, email, and purchasing role, plus an offline digital version. Provide enough context for a relevant quotation. Verify the recipient before sharing sensitive drawings or customer information.
6. Sample bag
Bring labels and a manageable bag. Connect every sample to its supplier and product reference. Ask permission before taking samples or photographs, and check carrier and customs requirements before transporting unfamiliar materials.
7. Comparison sheet
Use the same fields at every meeting. This original blank record is a working template, not a dataset of tested suppliers:
| Supplier | Booth number | Product | Quoted price | MOQ | Lead time | Certification | Notes |
|---|---|---|---|---|---|---|---|
Include currency, unit, specification, packaging, delivery term, and quote validity alongside price. Mark certification claims unverified until checked. Empty fields remain unknown; never complete them from assumptions.
8. Factory-audit questions
Ask about the manufacturing address, in-house processes, subcontracting, inspection records, and sample traceability. Establish what evidence could support a later factory visit. Booth answers are leads to investigate, not proof of production capability.
9. Payment boundaries
Define what needs checking before payment: the contracting entity, beneficiary, specification, and acceptance conditions. Decide who can approve exceptions. A fair meeting cannot resolve every payment risk; investigate unexplained identity or account discrepancies.
10. Itinerary backup
Save meeting contacts, booking confirmations, addresses, and your product brief offline. Allow room for missed appointments and further questions. Confirm appointments and the actual factory address before travelling to a supplier’s premises.
At the fair: 3 verification moves
Match the booth number to the company name. Compare the displayed name with the exhibitor listing and business card. Ask about differences between the exhibitor, manufacturer, and proposed contracting entity. Matching names alone do not verify ownership or capability.
Collect a card and photograph the product nameplate. With permission, capture model identifiers and connect the image to your comparison row. A photograph records what was displayed; it cannot authenticate certification or establish what production goods will contain.
Record MOQ and lead time immediately. Ask whether the minimum applies per order, model, colour, or packaging option. Establish when the production clock starts and whether it ends at completion or dispatch. Request written confirmation before relying on either answer.
After the fair: the 48-hour follow-up rule
Use a 48-hour follow-up target as a planning suggestion; it does not predict supplier response rates.
Send shortlisted contacts the same specification and a summary of your conversation. Request a written quotation, missing information, and documents supporting relevant claims. Identify the exact sample or model discussed.
Separate confirmed terms from unanswered questions. Align specifications, packaging, quantities, and delivery terms before comparing offers. A fast reply is useful, but remaining evidence gaps still require verification.
Limits
This checklist uses the public schedule and supplied category summary. It excludes visa policy, live booth changes, and assessments of individual exhibitors. No supplier audit, product test, or quotation comparison was performed for this article.
The template organises evidence; it cannot validate a supplier. Check the official website before departure and verify commercial claims independently.
Over to you
Which phase would you consider for a future session, and what product category are you sourcing? Leave your comment by email. Comments go to the editorial inbox; they are not posted publicly.
Next steps
Use the Canton Fair sample follow-up checklist to organize sample records.
Read next:
- How to Audit a Supplier Factory: From Documents to the Production Line
- How to Read Supplier Quotes and Make a Sourcing Decision Beyond Unit Price
Download the blank Fair Supplier Comparison Record.
Sources
- What to expect at the Canton Fair for small businesses… — Facebook
Questions & discussion
Share a question or a useful experience about this guide. Comments appear immediately. Your name and comment are public. Email is optional and stays private; reply emails are not enabled yet. Comment privacy.